Project Category: Properksa Projects

53

Main Walkway relocation

Location: Riyadh Type of work : supply and installation of steel in addition to a full relocation of a walkway Scope: Heavy lifts of steel walkway segments in addition to the steel members and handrail holding building weight: 2000 MT Each…

Read More
49

KSKD – Temp. bridge relocation

Type of work : Relocation of the bridge Scope: Heavy lifts of steel members, concrete footings, steel members, steel panels Bridge weight: 270 MT Type of connections: Bolts, bridge locks, concrete castings, and pins Crane capacity : 300 MT Special features:…

Read More
WhatsApp Image 2023-07-02 at 11.11.26 AM (1)

VIP buidlings – Banban Venue

Type of work : Relocation of the building Scope: Heavy lifts of steel modular in addition to the excavations, footings, steel members holding the modules and asphalt Building weight: 2500 MT Each module’s weight is 42 TONS Type of connections: Bolts,…

Read More